Skip to content
Discreet new bracket on a Wahroonga home
Level 2 electrical

Point of Attachment Upgrade North Shore

New attachments placed carefully on Federation, Arts and Crafts and heritage homes, and moved for extensions.

Get a free quote

Takes a minute. We'll call you back, usually the same day.

No obligation. Your details stay with us and are never sold or shared.

The point of attachment is where Ausgrid’s overhead service line meets your house. On North Shore period homes it might be a bracket under the eaves of a Federation house, a raiser through a terracotta or slate roof, or a fitting on the front parapet of a Lower North Shore terrace. It carries the line’s full tension and decides how close the line comes to your roof, windows and verandah.

Why it needs work

Old fixings. Many period homes had their supply added long after they were built, with the fitting fixed into soft brick, lime mortar or old timber. Over time, it loosens.

Re-roofs. Replacing terracotta or slate means the raiser comes out and goes back in, and is often due for replacement.

Renovations and second storeys. Attic conversions, upper floors and rear pavilions can put the bracket in the wrong place or too close to new windows.

Heritage presentation. Owners restoring a facade often want the fitting moved somewhere less visible.

Storms. Branches from tall gums pull lines and twist fittings.

A bracket hanging off the wall or a line drooping toward the verandah is urgent: stay back and ring our emergency level 2 electrician line.

Placing it well

The Service and Installation Rules of NSW set minimum heights over paths, driveways and roofs, and clearances from windows, verandahs and balconies. Within those rules, there’s usually more than one compliant position. On period and heritage homes we look for the least visible: a side wall, a rear corner, under an eave line. We check what’s behind the wall or roof before fixing, because a fitting is only as strong as what it’s fixed to.

Lower North Shore terraces

Terraces in Crows Nest, Neutral Bay, Cremorne and Wollstonecraft often have the bracket on the front parapet and the line crossing a narrow footpath. Rear-lane supplies are common too. We plan clearances carefully on these tight sites.

Combine it with the mains

Moving the attachment usually means extending or replacing the mains. If they’re old, a consumer mains upgrade at the same time saves a second outage. For renovations, we handle the power disconnection and reconnection and reconnect when the builders are done.

Or go underground

For many period homes, undergrounding is the best way to remove the fitting from view altogether. Compare the cost before deciding.

On the day

We lodge the notification with Ausgrid, disconnect, fit the new bracket or raiser, extend the mains and transfer the line, then reconnect, test and certify. Most jobs take half a day.

How long a fitting lasts

A well-installed galvanised bracket or raiser lasts decades. The ones we replace are usually original to the supply and have been fixed into soft brick or old timber that has given way over time.

Slate and terracotta roofs

Raisers through slate or terracotta need care to remove and refit without breaking the roof. If you’re restoring the roof anyway, that’s the time to replace or reposition the raiser, with the roofer there to make good around it.

Signs to look for

Cracked mortar around the fixings, a fitting that has tilted, or a line sagging closer to the verandah roof all mean it’s time for a look.

Get a price

Call your level 2 electrician North Shore team. We move and replace many fittings on period homes in level 2 electrician Wahroonga and Gordon.

Updated

The price depends on the bracket or raiser, what it fixes into, its height and visibility, and whether the mains need extending. We look on site and give you a fixed price.

What good point of attachment upgrade looks like

Close-up of point of attachment upgrade on a home in the North Shore area
What point of attachment upgrade looks like up close on a typical North Shore area home.
Signs that point of attachment upgrade needs attention
Typical signs that it needs attention.

Point of Attachment Upgrade questions on the North Shore

Something else on your mind? Call 02 9158 9919 and ask.

Can the bracket be moved off the front of our heritage home?

Often, to a side wall or rear corner, as long as the line has a compliant path from the pole. We'll look for the least visible option.

Our raiser goes through a slate roof. Can it be replaced without damaging the slates?

Yes, with care. If you're re-roofing anyway, it's the ideal time.

We're adding a second storey. Will the line move?

Nearly every time. Either a new fitting goes on the upper level in a compliant spot, or the line goes underground, and we sort it out with your builder early.

Point of Attachment Upgrade on the North Shore: step by step

  1. Assess the fittingWe check the bracket or raiser, its fixings into old brick or timber, and the line's clearances.
  2. Choose a discreet spotWe find a compliant position that keeps the street facade as original as possible.
  3. InstallNew fitting installed, mains extended, line transferred.
  4. ReconnectReconnected to Ausgrid's network, tested and certified.

Need a Level 2 electrician on the North Shore?

📞 Call now Free quote