Power Disconnection and Reconnection North Shore
Lines made safe for roofers, restorers, arborists and builders, then reconnected and certified.
The main switch turns off your circuits, but the service line, the bracket and the mains to the meter board stay live. On the North Shore, where period homes are being restored, re-roofed and extended, and tall trees need regular pruning, the supply often has to be isolated at the network side so trades can work safely.
Re-roofs and restorations
Slate, terracotta and Marseille tile roofs on Federation and Arts and Crafts homes are being restored or replaced. Roofers work right around the raiser, and restorers repointing brickwork or repairing eaves work near the bracket. We isolate for the days they need, then reconnect. If the fitting is tired, we replace it with a discreet point of attachment upgrade at reconnection.
Tree work
Tall gums near private lines and service lines need pruning. Arborists can’t safely work close to live lines. We isolate your private line or service, the arborist prunes, and we reconnect and check the line and fittings for damage.
Renovations and extensions
Attic conversions, second storeys and rear pavilions often change the supply route. We disconnect for the builder and reconnect to the new attachment or meter board.
Knockdowns
Before demolition, the supply is permanently disconnected and the service removed. We book ahead of the demolition date and set up a temporary builders supply on the same visit.
Lower North Shore
In Crows Nest, Neutral Bay and Cremorne, terraces and semis sometimes share supply arrangements, and blocks of flats have grouped meters. We check how the supply is arranged before booking and help strata managers notify residents.
Switchboard upgrades
When your electrician replaces the switchboard or main switch, the supply has to be isolated. We coordinate so it’s done in one day.
Written confirmation
We provide builders, roofers and arborists with written confirmation of the isolation for their safety records.
Before reconnecting
We check the bracket, mains and clearances after the work. If anything needs fixing, we explain and price it before going further.
On the day
We arrive at the agreed time and talk to whoever is on site about what they’re doing, where and for how long. We confirm how your supply is arranged, including any private pole or shared arrangement, isolate it at the right point and make it safe so it can’t be re-energised by accident. The trades get a clear go-ahead in person, and we tell them when we’ll be back.
Period homes need a second look
On Federation and Arts and Crafts homes, re-roofing and restoration can disturb the raiser, the bracket and the old mains running through the roof space. Before reconnecting, we check all three. If the mains are old rubber-insulated cable, we’ll recommend replacing them while the roof is open, because there won’t be a cheaper moment.
Tree protection
Where arborists are working on protected trees, the timing is often set by council conditions and the arborist’s schedule. We fit our isolation around both and stay flexible if the weather moves the day.
Medical needs and long outages
If anyone in the house relies on powered medical equipment, tell us when booking. We’ll keep the outage as short as possible and plan the timing around it.
Strata and shared supplies
On the Lower North Shore, blocks of flats and pairs of semis sometimes share mains or have grouped meters. A disconnection for one owner’s work can affect the neighbours. We trace the arrangement before booking, give the strata manager a written notice to circulate, and keep the outage as short as the work allows.
Timing
A planned isolation itself usually takes under an hour; what takes time is lining up the Ausgrid notice and your trades, so a few days’ warning helps.
Book it
Call your level 2 electrician North Shore team. For urgent safety problems, our emergency level 2 electrician service runs around the clock.
Updated
What good power disconnection and reconnection looks like
Power Disconnection and Reconnection questions on the North Shore
Something else on your mind? Call 02 9158 9919 and ask.
Our slate roof is being replaced. How long will we be without power?
Usually only while the roofers are working near the raiser or line. We reconnect as soon as they're clear.
Our arborist needs the line isolated to prune a gum. Can you do that?
Yes, for your private line or the line to your house. Trees near the street network are a matter for Ausgrid.
Does a knockdown need a Level 2?
Yes. Before demolition, the supply must be permanently disconnected by an accredited Level 2.
Power Disconnection and Reconnection on the North Shore: step by step
- Book around the tradesWe agree dates with your roofer, restorer, arborist or builder.
- Lodge with AusgridNotification lodged before the supply is touched.
- IsolateSupply made safe at the pole, pit, private pole or attachment.
- Reconnect or removeReconnected and certified, or removed for demolition.