Every North Shore build needs safe, metered power from day one, whether it’s a knockdown rebuild in Willoughby or Lindfield, a major renovation of a Federation home, or a new house on a subdivided battle-axe block. A temporary builders supply gives the trades a proper connection to the Ausgrid network.

North Shore sites

Street frontage. Most sites take a temporary pole or site board near the frontage, connected overhead from the nearest pole or from a pit.

Battle-axe and rear blocks. The supply usually goes at the street end of the access handle, with power run down to the build. Shared driveways mean planning with neighbours.

Tree protection. Many North Shore sites have protected trees with tree protection zones. We keep the site supply and any trenching out of them.

Sloping blocks. We place the supply on the most level practical spot near the street.

The right order

First the old house is permanently disconnected; on the same visit the site supply goes in. The build runs on it until the new meter board is ready, then we connect the permanent supply and take the temporary one away.

Our power disconnection and reconnection page covers step 1. Large new homes are often all-electric and three phase; lodge the three phase power application early.

What we need

The address, the builder’s details, the site plan with any tree protection zones marked, single or three phase, the start date, and confirmation that a retailer account is open for the site.

Safety on site

We install site supplies with the safety switches and protection the rules require. If overhead lines run near the work area, we advise on keeping cranes and scaffold clear, and can arrange isolation during critical work.

Common hold-ups

No retailer account, the pole placed where the driveway goes, the wrong number of phases, or demolition booked before disconnection. We cover each at the start.

Moving it

If the site supply has to move for the driveway or landscaping, we relocate it with a short disconnection.

At handover

We connect the permanent supply, often underground, test and certify, and remove the temporary supply.

Neighbours on battle-axe sites

On subdivided blocks, the access handle is often shared. A temporary pole at the street end has to sit where it won’t block a neighbour’s car, bins or deliveries. We agree the position with the builder and, where needed, the neighbours, before the pole goes in.

Heritage and conservation areas

Rebuilds and major renovations in conservation areas often come with conditions about trees, fences and the streetscape. We keep the site supply clear of protected trees and off heritage fences and walls.

Weather on site

Storms blow through the canopy quickly. If a storm damages the site supply or brings branches down on it, keep the trades clear and call us. We make it safe and restore power as soon as we can.

Project builders and architects

Architect-designed homes often have a long build and changing site layouts. We stay in touch with the builder through the job and move the site supply when the plan changes.

Protecting the streetscape

North Shore councils care about street trees and the look of the street during a build. We keep the site supply tidy, off the nature strip where possible, and clear of street tree roots.

Common hold-ups

Most delays come from paperwork rather than the work: no retailer account for the site, so no meter; the temporary pole placed where the driveway goes; single phase ordered for a three phase home; or demolition booked before the old supply is disconnected. We go through each with you and the builder at the start.

Book site power

Builders across level 2 electrician Willoughby, Lindfield and Chatswood use us. Call the North Shore level 2 electrician team.

Updated

Site supply is priced on the pole or board type, single or three phase, the connection point, access on sloping or narrow sites, and how it's removed or converted at the end. We confirm on site.

What good temporary builders supply looks like

Close-up of temporary builders supply on a home in the North Shore area
What temporary builders supply looks like up close on a typical North Shore area home.
Signs that temporary builders supply needs attention
Typical signs that it needs attention.

Temporary Builders Supply questions on the North Shore

Something else on your mind? Call 02 9158 9919 and ask.

We're building on a battle-axe block. Where does site power go?

Usually near the street end of the access handle, with leads or a sub-board down to the build. We plan it with the builder and neighbours.

Can the temporary pole go near protected trees?

We keep it out of tree protection zones and away from roots.

Can site power be three phase?

Yes, if three phase is available. Large builds often use it.

Temporary Builders Supply on the North Shore: step by step

  1. Site itWe place the supply where it won't clash with machinery, trees under protection or neighbours' access.
  2. ArrangeWe lodge with Ausgrid and give you the wording for your retailer account.
  3. InstallTemporary pole or board installed, connected and tested.
  4. FinishPermanent supply connected at handover; site supply removed.